伊人网站在线观看,亚洲一区电影,日本免费久久,国产精品视频一区二区三区,人成精品视频三区二区一区,亚洲天堂免费视频,沟沟人体艺木艺欣赏

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Located in wedbank coalfield, South Africa, Kral coal mine invested in the construction of a 3.0mt/a dry coal preparation plant in 2010 to separate No. 2 thermal coal. The ash content of raw coal is 40.4%, the ash content of cleaned coal after beneficiation is 30.6%, and the recovery rate is 85%. It is mainly sold to power plants. The dry separation plant has an hourly processing capacity of 500 tons and an annual operation of 6000 hours. It has the advantages of short investment payback period, low operation cost and high recovery rate.

KRAL COAL MINE

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE